Hubert Blonk Papers. SPC-006-0628-5-9-8
Document Type
Image
Creation Date
2-3-1938
Physical Description
Black and white photograph
Imaging Information
Scanned at 600 ppi TIFF format, resized to 72 ppi JPEG format.
Description
The preparation of the southern end of the dam site has had most of the loose rock removed, and the cofferdam complete. The work of removing soil and loose rock on the north end of the dam was still under way.
Repository
Archives & Special Collections, Eastern Washington University Libraries.
Rights
Copyright status is unknown and has not been evaluated. Users are responsible for assessing and/or securing use permissions. For further information, contact Eastern Washington University Libraries, Archives & Special Collections, https://www.ewu.edu/library/ewu-archives-special-collections/.
Use Permissions
For permission to publish, contact Eastern Washington University Libraries, Archives & Special Collections (509) 359-2475. For ordering information go to: https://www.ewu.edu/library/ewu-archives-special-collections/
Keywords
Grand Coulee Dam (Wash.); Hydroelectric power plants -- Washington (State); Dams -- United States -- Design and construction; Cofferdams -- Design and construction