Preview
Source
Hubert Blonk Papers. SPC-006-0628-5-14-32
Document Type
Image
Creation Date
January 1937
Date Information
circa 1937
Physical Description
Black and white photograph
Imaging Information
Scanned at 600 ppi TIFF format, resized to 72 ppi JPEG format.
Description
Shows construction method for the lower portion of the dam. Alternating blocks were constructed. The Columbia River was forced through slots by placement of temporary gates on the upstream side of the dam.
Repository
Archives & Special Collections, Eastern Washington University Libraries.
Rights
Copyright status is unknown and has not been evaluated. Users are responsible for assessing and/or securing use permissions. For further information, contact Eastern Washington University Libraries, Archives & Special Collections, https://www.ewu.edu/library/ewu-archives-special-collections/.
Use Permissions
For permission to publish, contact Eastern Washington University Libraries, Archives & Special Collections (509) 359-2475. For ordering information go to: https://www.ewu.edu/library/ewu-archives-special-collections/
Keywords
Grand Coulee Dam (Wash.); Hydroelectric power plants -- Washington (State); Dams -- United States -- Design and construction
Notes
USBR Print No. 2104-2