Preview
Source
Hubert Blonk Papers. SPC-006-0628-5-14-18
Document Type
Image
Creation Date
3-1-1940
Date Information
March, 1940
Physical Description
Black and white photograph
Imaging Information
Scanned at 600 ppi TIFF format, resized to 72 ppi JPEG format.
Description
Interior of a power house before the generators were installed.
Repository
Archives & Special Collections, Eastern Washington University Libraries.
Rights
Copyright status is unknown and has not been evaluated. Users are responsible for assessing and/or securing use permissions. For further information, contact Eastern Washington University Libraries, Archives & Special Collections, https://www.ewu.edu/library/ewu-archives-special-collections/.
Use Permissions
For permission to publish, contact Eastern Washington University Libraries, Archives & Special Collections (509) 359-2475. For ordering information go to: https://www.ewu.edu/library/ewu-archives-special-collections/
Keywords
Grand Coulee Dam (Wash.); Hydroelectric power plants -- Washington (State); Dams -- United States -- Design and construction
Notes
USBR Print No. 5885-3