Preview
Source
Hubert Blonk Papers. SPC-006-0628-5-19-23
Document Type
Image
Creation Date
9-1-1957
Date Information
September, 1957
Physical Description
Black and white photograph
Imaging Information
Scanned at 600 ppi TIFF format, resized to 72 ppi JPEG format.
Description
Construction of McNary Dam began in 1947.
Repository
Archives & Special Collections, Eastern Washington University Libraries.
Rights
Copyright status is unknown and has not been evaluated. Users are responsible for assessing and/or securing use permissions. For further information, contact Eastern Washington University Libraries, Archives & Special Collections, https://www.ewu.edu/library/ewu-archives-special-collections/.
Use Permissions
For permission to publish, contact Eastern Washington University Libraries, Archives & Special Collections (509) 359-2475. For ordering information go to: https://www.ewu.edu/library/ewu-archives-special-collections/
Keywords
McNary Dam (Wash.); Hydroelectric power plants -- Washington (State); Dams -- United States -- Design and construction
Notes
Date written on back of print. Actual construction began in 1947, powerhouse complete in 1957.