Concrete was carried from the mixing plant to the job site in four cubic yard buckets, which were loaded on flat cars, each carrying four of the buckets at a time. The trains ran out onto temporary trestle work, and cranes picked up the buckets, then swung them into location over the forms, where they were dumped.
Repository
Archives & Special Collections, Eastern Washington University Libraries.
Rights
Item is under copyright. Users are responsible for assessing and/or securing use permissions. For further information, contact Eastern Washington University Libraries, Archives & Special Collections, https://www.ewu.edu/library/ewu-archives-special-collections/.
Use Permissions
For permission to publish, contact Eastern Washington University Libraries, Archives & Special Collections (509) 359-2475. For ordering information go to: https://www.ewu.edu/library/ewu-archives-special-collections/
Keywords
Concrete construction; Grand Coulee Dam (Wash.); Hydroelectric power plants -- Washington (State); Dams -- United States -- Design and construction